Categories

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

Public Info Hearing on Fire & Ambulance Bldgs Jan 16 2024

City of Ely, MN, required informational hearing 5-5:30 pm. See City website for packet documents, including drawings: www.ely.mn.us/2024-meetings

These are preliminary plans. The City wants project ready for bidding in next few months, so construction can start this summer 2024. Harold Langowski, Ely Clerk/Treasurer, provided details of locations and building improvements, using the overhead screen. Garage will be fully heated ($$). Current and new housing planned for this area.

Listen for additional construction, additional building remodeling, fence relocation, and street(s) redesign planned AFTER the fire apparatus building and ambulance garage are built. These additional materials and labor costs are probably not included in proposal presented tonight. It is not known if or when a detailed list will be presented, along with an indication who will be responsible for funding.

1 resident questioned the need for new garage and facilities. He felt we could use current buildings (with some remodeling) for equipment/machine storage. Staff didn’t need new facilities to meet: use existing rooms. He also questioned going ahead without knowing if EBCH will take ambulance services back. A Joint Powers Ambulance meeting will be held Jan 22 at 4 pm at Winton Community Center.

1 other resident praised the plans and work that went into the proposal presented tonight. The buildings are necessary.

Leave a Reply

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

  

  

  

*